R
Rod Speed
Guest
"Petzl" <petzlx@gmail.com> wrote in message
news:9fq66c9u3q13v507rq21s0r3fe6od0gj4f@4ax.com...
There should still be some ID label on it unless someone
has fucked up and its still got the temporary cover.
The only guarantee is for 25Mb and that is only after the coexistence
period which happens for 18 months. Until then the only guarantee is 12/1
news:9fq66c9u3q13v507rq21s0r3fe6od0gj4f@4ax.com...
On Wed, 28 Dec 2016 18:13:10 +1100, "Rod Speed"
rod.speed.aaa@gmail.com> wrote:
Thanks for this Rod, Telstra have removed many pillars now I only see
one where there was none before the only number is on the cabinet
2CBT-08-18-FNO-001
https://dl.dropboxusercontent.com/u/50667687/DSCN0485.JPG
There should be a number on that pillar and you need to know
that to know if it's the pillar you are connected to now. The lettering
may be quite faded, but it will be there. Much bigger letters than
on the node cabinet.
NBN or whoever have even replaced the 2nd hand pillar they originally
used.
https://dl.dropboxusercontent.com/u/50667687/NBNcabnet2.jpg
The "new" one is painted silver
There should still be some ID label on it unless someone
has fucked up and its still got the temporary cover.
The bill from Telstra only name the "plan" not to details there "verbal's"
said I would be on a down speed, promised was at 50Mb/s.
The only guarantee is for 25Mb and that is only after the coexistence
period which happens for 18 months. Until then the only guarantee is 12/1