Guest
I just puchased a new timer relay Midtex 658-44 with variable on and
variable off delays
I want to run the load on for a few seconds every few minutes
so I want to use configuration 6 on the document.
ftp://partsarts@divxdude.dyndns.org/midtx658.pdf
u may need to use a ftp client to retrieve it.
I'm not real electronics savy anf am really confused by the
insructions
facts that
config 6 shows 2 sperate sets timer inputs (4 pins)
pinout diagram(8-pin "Wiring") does not provide 4 points for
2 sperate timers
config 6 also shows 3 relay symbols 2 which are in K-1
( B is used for load )
anyway..if I were to guess at it..
8 pins numbered clockwise starting bottm-left of the octal "notch"
looking from bottom (right?)
1. jumper pin 3
to pin 2
2 jumper pin 1 to
pin 5
apply input power A to ( pin 1or 5 ) and input power B to pin 7
load is powered by {(switched) pin 4} and {input power B}
how'd i do? guessed right or not?
if not please correct me.
thanks for your help.
variable off delays
I want to run the load on for a few seconds every few minutes
so I want to use configuration 6 on the document.
ftp://partsarts@divxdude.dyndns.org/midtx658.pdf
u may need to use a ftp client to retrieve it.
I'm not real electronics savy anf am really confused by the
insructions
facts that
config 6 shows 2 sperate sets timer inputs (4 pins)
pinout diagram(8-pin "Wiring") does not provide 4 points for
2 sperate timers
config 6 also shows 3 relay symbols 2 which are in K-1
( B is used for load )
anyway..if I were to guess at it..
8 pins numbered clockwise starting bottm-left of the octal "notch"
looking from bottom (right?)
1. jumper pin 3
to pin 2
2 jumper pin 1 to
pin 5
apply input power A to ( pin 1or 5 ) and input power B to pin 7
load is powered by {(switched) pin 4} and {input power B}
how'd i do? guessed right or not?
if not please correct me.
thanks for your help.